Saskatchewan
Condo Reserve Fund Studies in Swift Current
Under Saskatchewan's Condominium Property Act, 1993, any Swift Current condominium corporation with 12 or more units must get a reserve fund study at least every five years, with a horizon of at least 25 years. Reserve Plus serves Swift Current and southwest Saskatchewan: request a quote online and it arrives by email in seconds.
What kinds of condos are in Swift Current?
Low-rise and townhouse developments, almost entirely. The 2021 Census counted about 930 condominium households in Swift Current, roughly 13 per cent of households, which is a higher share than Moose Jaw or Prince Albert. Across all housing, the city had about 1,280 apartments in buildings under five storeys, about 370 row houses and only about 105 apartments in buildings of five storeys or more.
That shapes what a Swift Current study focuses on. Without elevators, parkades or large central plants, the big items are usually:
- Roofs, often the largest single cost, whether shingled townhouse roofs or low-slope membranes on apartment buildings.
- Exterior walls and windows, including siding, stucco, sealants, doors and garage doors.
- Paving and site work: private roads, parking areas, curbs, sidewalks, fencing and site lighting. In a townhouse or bare land corporation these can outweigh the buildings themselves.
- Unit-level systems the corporation owns, if the bylaws make them common property.
How old is Swift Current's housing?
About 65 per cent of the city's occupied dwellings were built before 1981, and about 595 were built from 2011 to 2021. Many corporations are therefore planning for the second replacement of components such as roofs and paving, not the first.
Prairie weather adds to the wear. Repeated freezing and thawing breaks down asphalt, concrete and masonry, and wind-driven snow and rain find any weakness in roofs, flashings and sealants. The study's condition ratings and remaining-life estimates should reflect what is actually on site, not a generic table.
Saskatchewan's requirements for Swift Current corporations
- Who: corporations of 12 or more units. Smaller corporations are not required to have a study.
- When: the first study within three years of the first annual general meeting, then a new study or substantive update at least every five years.
- How far ahead: at least 25 years. We model 30.
- Who prepares it: an engineer, architect, applied science technologist, AACI appraiser or certified reserve planner with at least $1,000,000 of liability insurance.
- What follows: an annual reserve fund report to owners, and disclosure of any shortfall in the estoppel certificate when a unit sells.
See the Saskatchewan page and the requirements in every province.
How much does a study cost in Swift Current?
The price depends on the size and complexity of the property. Smaller condominiums of fewer than 50 units typically run $1,500 to $5,000, larger townhouse complexes and mid-rise apartments of 50 to 200 units $3,500 to $7,500, and high-rise apartment buildings of more than 200 units $7,500 to $10,000 or more. Details are in the cost guide, and the quote form gives your exact price.
Do you serve communities near Swift Current?
Yes. We prepare studies for corporations across southwest Saskatchewan, including Maple Creek, Gull Lake and Shaunavon. Nearby city pages: Moose Jaw and Regina.
Questions from Swift Current boards
We are a townhouse corporation. What does the study cover?
Everything the corporation is responsible for under its plan and bylaws: typically roofs, exterior walls, windows and doors, decks, fencing, roads, parking and site services. We confirm the boundaries from your registered plan and bylaws before we start.
We are a bare land condominium. Do we need a study?
If the corporation has 12 or more units, yes. In a bare land corporation the owners usually look after their own homes, so the study focuses on roads, utilities, landscaping, fencing and any shared buildings. These studies sit at the low end of the price range.
How often will we need a new one?
At least every five years. Standard and Premium studies include myRPlanner for the five-year term, so the board can keep the plan current between studies.
How do we get started?
Request a quote with your building type, unit count and address. Once the board approves it, we book the site visit, and the first draft follows about 30 days after approval.