Saskatchewan

Condo Reserve Fund Studies in Moose Jaw

Moose Jaw condominium corporations of 12 units or more are required by Saskatchewan law to obtain a reserve fund study at least every five years, covering a period of at least 25 years. Reserve Plus prepares reserve fund studies in Moose Jaw; the quote is emailed within seconds of your request and the first draft is ready about 30 days after the board says yes.

Get your Moose Jaw quote in seconds

01

Why do older Moose Jaw buildings need careful planning?

Moose Jaw has one of the oldest housing stocks of any Saskatchewan city. In the 2021 Census, about 5,525 of its roughly 14,700 occupied dwellings were built in 1960 or earlier, and another 5,320 between 1961 and 1980. That is close to three in four homes built before 1981. Only about 1,000 were built from 2011 to 2021.

Older buildings are not a problem in themselves, but they make the study's job harder. Components may have been replaced piecemeal over the years, records are often incomplete, and some systems, such as cast iron drain piping, older electrical panels or original masonry, need a closer look than a newer building would. The more history the board can find before the site visit, the more accurate the remaining-life estimates will be.

02

How many condos does Moose Jaw have?

Not many. The census counted about 1,065 condominium households, about 7 per cent of households in the city. The city's apartments are mostly in low-rise buildings: about 2,245 units in buildings under five storeys and about 635 in buildings of five storeys or more, plus about 410 row houses.

With a small market, many Moose Jaw corporations are small, and some will fall under the 12-unit threshold where a study is optional rather than required.

Brick low rise apartment building with snow along the front walk
Older walk-ups need a closer look at masonry, walks, piping and original components. Photo: Jeremy Boley / Unsplash
03

What if a building is being converted to condominium?

Saskatchewan has a specific rule for conversions. When an existing apartment building becomes a condominium, the reserve fund study must be completed before any unit is sold. Owners in older converted buildings inherit decades of wear on day one, so the first study sets the tone for the corporation's finances. If you are planning a conversion in Moose Jaw, bring us in early.

04

The Saskatchewan rules in brief

Every corporation of 12 or more units needs a study at least every five years. A new corporation's first study is due within three years of its first annual general meeting. The study looks ahead at least 25 years, and we model 30. It must be prepared by an engineer, architect, applied science technologist, AACI appraiser or certified reserve planner holding at least $1,000,000 of liability insurance. The board reports on the fund to owners every year, and the estoppel certificate shows any shortfall when a unit sells. More on the Saskatchewan page and the requirements by province.

05

What does a Moose Jaw study cost?

Studies are priced on the size and complexity of the property. Smaller condominiums of fewer than 50 units typically run $1,500 to $5,000, larger townhouse complexes and mid-rise apartments of 50 to 200 units $3,500 to $7,500, and high-rise apartment buildings of more than 200 units $7,500 to $10,000 or more. Read the cost guide or get your price from the quote form.

06

Communities around Moose Jaw

We also prepare studies for corporations in the surrounding area, including Caronport and Assiniboia. See our pages for Regina and Swift Current.

07

Questions from Moose Jaw boards

Our building is more than 50 years old and we have little paperwork. Can you still do the study?

Yes. Missing documents do not stop a study. We record what we find on site and estimate remaining life from condition, and the plan gets sharper as the board adds records over time.

Freeze-thaw has cracked our front steps and walks. Are those in the study?

Yes. Concrete steps, walks, paving and other site work are common property components and belong in the plan, along with roofs, windows, balconies and mechanical systems.

We are converting a rental building. When do we need the study?

Before the first unit is sold.

Do we have to follow the study's funding recommendation?

The regulations require the corporation to take the most recent study into account when it sets the reserve fund amount. Underfunding does not trigger automatic enforcement, but the board reports on the fund to owners every year and any shortfall shows up in the estoppel certificate when a unit sells.

Get your Moose Jaw quote in seconds

Tell us the building type, unit count and address. Your quote arrives by email as a PDF.

Request a quote