Reserve Fund Analysis

A study is only the first step. Ongoing analysis keeps your forecast accurate and catches problems before they become special assessments.

myRPlanner client portal logo
01

Why analyze your reserve fund study?

Traditionally, reserve fund studies are static documents created to give the best picture of expenditures over a set forecast. As a study ages, the projected forecast begins to deviate from the reserve's actual financials. Common causes of that deviation include:

Unexpected expenditures

Unaccounted-for expenditures can leave the reserve underfunded, even when the work genuinely needed doing.

Changes to contributions

The study recommends annual contributions, but those may be ignored for a number of reasons.

Incorrect cost estimates

When a component is replaced, unforeseen damage (e.g. water damage from a leaking roof) can increase the cost.

Incorrect modeling

Interest and inflation rates have a large effect on projections; small early discrepancies compound into big issues.

There are no provincial rules dictating when a forecast must be recalculated, but it's in owners' best interest to keep it as accurate as possible. When analyzing a study, you generally want to confirm that contributions meet or exceed the recommended amount, expenditures are at or below projections, any deferred expenditures show up as a surplus, and inflation and returns are in line with what was projected.

Looking forward matters too: a replacement expected in 3 years might be pushed back after further inspection. That improves interest savings, although inflation will raise the eventual cost. Analysis can highlight excess funding just as easily as a shortfall, which can mean lower contributions and savings for owners.
Analyst working through a building plan and spreadsheet on a laptop with handwritten notes
An analysis tests the assumptions behind an existing study: costs, timing and contributions. Photo: ThisisEngineering / Unsplash
02

The importance of analysis

An accurate study is only the first step in protecting your most important asset. Ongoing analysis is the second. It keeps you on top of the reserve's financials and shows the impact of real-life changes a static study can't predict.

Asset protection

Account for any deviation from the original plan so adequate capital is available, reducing or eliminating the need for special assessments.

Peace of mind

Ongoing analysis reduces the risk of a special assessment and makes the property more attractive when selling.

Smarter decisions

Understanding the numbers leads to better decisions. It also shows buyers that the property is in control of its financial future.

03

Getting the most from your analysis

If time is going to be spent analyzing the reserve, target the right indicators and consider the property's future goals. The board should be able to add future expenditures they would like included, with the understanding that major changes can create cash flow issues. A financial analysis then projects the future closing balance, and an updated contribution schedule may be required. We recommend providing multiple contribution schedules so the property understands what's required and how to get there. The key questions are always: where are you, where are you going, and how will you get there?

04

Annual analysis or a new study?

An annual analysis is usually enough when

  • The study is still within its legal term: five years in most provinces we work in, or the current three-year cycle in Ontario.
  • Work has happened roughly as planned, even if some items moved a year or two.
  • What has changed is costs, timing, the opening balance or the contributions, which is exactly what an analysis updates.

You need a new study or update when

  • The legal term is up. An analysis does not reset the clock on the required study.
  • The building has changed: an addition, a system replaced with something different, or components the study never included.
  • Large unplanned work or damage, such as a failed roof or a major leak, has changed the condition of several components at once.
  • The analysis keeps showing a shortfall that the current funding plan cannot close, and the board needs new funding models.

Not sure which applies? Send us the study and a summary of what has happened since, and we will tell you. Province by province terms are on our requirements page.

05

How Reserve Plus saves you money

Corporations and stratas use Reserve Plus to analyze the study after it's generated, through myRPlanner. myRPlanner supports analysis through two products:

5-Year Plan

Adjust the expected cost and replacement/maintenance year of expenditures. Using the current balance and the study's contribution schedule, myRPlanner updates the forecast. If deficiencies appear, two recommended funding scenarios help the property avoid a special assessment. Update it annually to continually refine the forecast.

Annual Report

Track actual expenditures and financials, and compare the original forecast with an adjusted one based on real inputs. Share it with owners at the AGM, and use the special assessment risk score to know whether to stay the course or revisit the 5-year plan. myRPlanner also hosts key documents and provides ongoing support interpreting your results.

Keep your study accurate, year over year.

Ask us how reserve fund analysis works with myRPlanner.

Request a quote
06

Reserve fund analysis questions

Does an annual analysis replace the reserve fund study our province requires?

No. The province sets when a new study or update is due, and an analysis does not change that date. The analysis keeps the existing study accurate in the years between.

How often should we analyze our reserve fund?

Once a year, ahead of the budget and the AGM. Each update uses the current balance, actual spending and the latest cost and timing information, so the forecast does not drift.

When do we need a new study instead of an analysis?

When the legal term is up, when the building has changed, when large unplanned work has changed the condition of several components, or when the analysis shows a shortfall the current plan cannot close.