Ontario
Condo Reserve Fund Studies in Ottawa
Ottawa condominium corporations need a reserve fund study every three years under Ontario's Condominium Act, 1998, alternating between updates with and without a site visit. Reserve Plus prepares Class 1, Class 2 and Class 3 studies for Ottawa boards and property managers. Every Ontario study is signed by Taylor Smith, P.Eng., licensed with Professional Engineers Ontario, and your quote arrives by email within seconds.
Why do townhouses matter so much in Ottawa?
Row housing is a large part of Ottawa's housing. The 2021 Census counted about 87,045 row houses in the city, about one in five occupied dwellings and more than the 76,895 apartments in buildings of five storeys or more.
A townhouse corporation's study looks different from a tower's. With no elevators or central plant, the plan is usually driven by:
- Roofs, whether each block has its own roof or the corporation replaces them in phases.
- Exterior walls, windows and doors, including siding, brick, sealants and garage doors.
- Private roads, parking and walkways, with curbs, catch basins and site lighting.
- Decks, fences and retaining walls, if the declaration makes them common elements.
The declaration and description decide what the corporation looks after and what each owner does. We confirm those boundaries before the site visit so the inventory matches what the corporation actually has to fund.
How many Ottawa households live in condominiums?
About 65,705, roughly 16 per cent of households in the city. Apartment buildings of five storeys or more add the components that drive the largest plans: elevators, parkade slabs and membranes, window wall and balcony systems, boilers and chillers, and fire and life safety equipment.
How old are Ottawa's buildings?
Both ends of the age range are well represented. About 44 per cent of occupied dwellings were built before 1981, and about 59,845 were built from 2011 to 2021. Older corporations are planning second replacements of roofs, windows and mechanical systems. Newer ones are at the start of the cycle, where the Class 1 study sets the baseline every later update builds on.
Ontario's study cycle
- Class 1, comprehensive: within the first year after registration, with a full site inspection.
- Class 3, update without a site visit: within three years of the Class 1.
- Class 2, update with a site visit: three years after that. Class 2 and Class 3 updates then alternate every three years.
Every class projects at least 30 years. After the study arrives, the board has 120 days to propose a funding plan, then 15 days to send owners a Notice of Future Funding, and the plan takes effect within 30 days of the notice. See Class 1 vs Class 2 vs Class 3 and the Ontario requirements.
What does an Ottawa study cost?
Price follows the size and complexity of the property. Smaller condominiums of fewer than 50 units typically run $1,500 to $5,000, larger townhouse complexes and mid-rise apartments of 50 to 200 units $3,500 to $7,500, and high-rise apartment buildings of more than 200 units $7,500 to $10,000 or more. Under section 94(7) of the Act, the cost of the study can be paid from the reserve fund. See the cost guide or get your price from the quote form.
Communities we serve around Ottawa
We work with corporations across the city, including Kanata, Orléans, Nepean and Barrhaven. In the GTA, see Toronto.
Questions from Ottawa boards
We are a townhouse corporation. Which parts does the study cover?
Everything the corporation repairs or replaces under its declaration, which usually includes roofs, exterior walls, windows, roads and parking. Ontario's regulation requires every component with a replacement cost over $500 and a major repair or replacement expected within 30 years to be in the inventory.
Our last study was a Class 3. What comes next?
A Class 2 update, three years after the Class 3. It includes a site visit, so the condition ratings and remaining-life estimates are refreshed from what is actually on site.
Can the study be paid for out of the reserve fund?
Yes. Section 94(7) of the Condominium Act, 1998 allows the cost of the study to be charged to the reserve fund.
How long does an Ottawa study take?
The first draft arrives about 30 days after the board approves the quote, including booking the site visit.
Get your Ottawa quote in seconds
Tell us the building type, unit count and address. Your quote arrives by email as a PDF.
Request a quote