Manitoba
Condo Reserve Fund Studies in Winnipeg
Winnipeg condo corporations need a reserve fund study at least every five years under Manitoba's Condominium Act, with a projection of at least 30 years. Reserve Plus prepares them across Manitoba, signed by a P.Eng. or C.E.T., with a first draft about 30 days after your board approves the quote.
What Manitoba requires
First study
Within 3 years of the condominium plan being registered.
Every five years
A new study or a substantive update, with a 30-year projection and a full component inventory.
Every year
The board reports the reserve fund balance to owners and reviews the study.
Manitoba sets no minimum reserve balance, but the board must consider the study's recommended balance when it sets contributions, and a buyer must be told both the actual and the recommended balance. An underfunded reserve shows up at every sale. The corporation also has to keep the current study, every update and the previous two studies on file. Full Manitoba requirements.
Who prepares your study
Manitoba's Condominium Regulation allows professional engineers, architects, certified technologists, AACI appraisers and certified reserve planners, as long as they are independent of the corporation. Reserve Plus studies in Manitoba are signed by a P.Eng. or C.E.T., and our own building envelope team travels for the site visit. Reserve Plus has prepared more than 1,200 reserve fund studies across Canada since 2012.
Costs depend mostly on building type and size; see our cost guide, or get your exact price from the quote form in seconds.
Questions from Winnipeg boards
Does Reserve Plus do reserve fund studies in Winnipeg?
Yes. We prepare reserve fund studies for condominium corporations in Winnipeg and across Manitoba. Studies are signed by a professional engineer or certified engineering technologist qualified under Manitoba’s Condominium Regulation, and our own team travels for the site visit.
How often does a Winnipeg condo need a reserve fund study?
At least every five years, under Manitoba’s Condominium Act (S.M. 2011, c. 30, Sch. A). A new corporation must complete its first study within 3 years of registration. Every study must cover at least 30 years.
Does Manitoba set a minimum reserve fund balance?
No. But the board must consider the balance recommended in the most recent study when setting contributions, report the reserve fund balance to owners, and review the study each year. When a unit is sold, the buyer must be told both the actual balance and the balance the study recommends.
Who can prepare a reserve fund study in Manitoba?
Section 25 of the Condominium Regulation lists professional engineers, registered architects, certified technologists (CAST or C.E.T.), AACI appraisers and certified reserve planners. The provider must be independent of the corporation.
How long does a Winnipeg study take?
The first draft arrives about 30 days after the board approves the quote, including booking the site visit. Your quote arrives by email within seconds.
Get your Winnipeg quote in seconds
Tell us the building type, unit count and address. Your quote arrives by email as a PDF.
Request a quote