Reserve Fund Study · Alberta
Reserve Fund Study in Cochrane
Reserve Plus has been engaged for more than 600 reserve fund studies across 40 Alberta communities since 2012 — more than 425 of them in the Calgary region.
Our record near Cochrane
Reserve Plus has worked in 40 Alberta communities since 2012, including 13 across the Calgary region. These are engagements, not enquiries — corporations that appointed us. Across Alberta we study everything from small bare-land and townhouse corporations to properties of more than 500 units. Of those, more than 55 have 100 units or more.
In Cochrane
10 reserve fund studies (2019–2025), covering 148 units. Every report is authored by a qualified professional and delivered as a first draft in 30 days or less, with myRPlanner (powered by StelorPM) included for the full term.
What Alberta requires
Requirements are set by the province, not the municipality, so a Cochrane corporation is governed by the same rules as the rest of Alberta. The full requirements, including who is eligible to author the report, are on our Alberta page.
What you receive
Component inventory
Every common-property component — building envelope, interior, mechanical and life-safety — recorded with its present condition.
Condition and remaining life
Actual and effective age, remaining life, and current and future replacement cost for each component.
30-year financial projection
The contribution levels needed to meet those costs, and the special-assessment risk if they are not met.
myRPlanner, included
Keep the plan current between studies, approve it as most jurisdictions require, and compare actual against expected each year.